Boiler replacement of (5) 40,000 PPH boilers, installation of (2) 75,000 PPH temporary boilers, replacement of fuel tanks, abatement, rigging operations, excavations, controls, piping and x-ray weld scanning. The boilers serve SUNY Downstate’s Basic Science building, Health Science Education Building and the Hospital.
SUNY Downstate Medical Center Boiler Replacement


AGENCY/OWNER: SUCF
CLIENT: Jacobs
PROJECT VALUE: $46M
PROJECT CATEGORY:
PROJECT DETAILS: